Phase 1: ETC Smart Bars, mounted as main front light, and back light. Installed in 2008

Phase 2 breakers: New pipes and breakers. Breaker box is located in Stage Left closet. Far right panel. Installed in 2016.

https://docs.google.com/drawings/d/14Tr97IUBH62QskpEhvQObRPq7LdcwLTOjvDUeep8Y68/edit?usp=sharing